ToDo CMH Caretaker Published
Caretaker Manual Shortcut
Linked online at https://www.captainmorsehouse.com/operations/
Finish the trim and gutter work on the NW corner of the house
Gutter for portico with custom 1” pipe to vertical leader
Replace curbing along driveway property line - rustic style
In process ………….
masonry and stonework
- Complete the back wall along the fence with old curbing and stone
- Re-level brick patio
- Replace two non-matching stones outside kitchen doors with one large stone
- Raise the stone on the West kitchen door to improve ventilation
- Repair chimneys - stucco, cap & paint Fall 2026
- Redo the flashing around chimneys (quote separately)
Carpentry
- New Arbor gate fence along Morse Street for patio gate - fix steps first, add lighting for steps, gate must be wide enough for 8ft table/tent poles
- Fix or replace 3 doors (kitchen doors + patio door)
- Install new front triple hung windows
- Improve East cellar scuttle
- Finish wall with bluestone top (reuse driveway pieces if possible)
Erick POSTOFFICE VISITS weekly
Alex Geary 781-484-8023
Deploy mouse catch pads (mouse sighted in front room)
LAUNDRY
- New Laundry Machines (2 washers + 3 dryers) - may need door enlargement
DRYER Whilrpool MGD5030MW
Maytag Washer MTW5205TW Gas Dryer Maytag 7.4 cu. ft. Top Load Gas Dryer (Model MGD6205RW or MGD6205RF
Dryer MGDP585GW $1,221
Closet Done
Skylight done - FAKRO Skylight spring tighten